Institutional Customers - Experience

Niagara Health System, Niagara Region, Ontario
As Energy Manager for the NHS, prepared Energy Budgets; prepared Request for Quotation for comprehensive investment grade Energy Audit of all eight (8) Sites and managed the successful Energy Auditor. Assisted in decision on utilization of an existing 2 MW Cogeneration System. Involved in sub-metering projects and resolution of water meter challenges.
Case Study

London Health Sciences Centre
Preparation of Strategic Energy Plan for Comissioners Road (Victoria Hospital) Site. Also performed detailed engineering analysis of Powerplant system, including comparing performance of existing boiler feedwater system to future needs. Also, compared achievable peak output of five existing boilers to future needs.Prepared Issued for Construction drawings (2,700 ft of District Energy/Steam Piping, complete with 10 vaults). Preparation of specification for construction of District Energy System (per CCDC 2). Designed tie-ins for new Condensate Polisher.

Case Study

Carleton University, Ottawa, Ontario
Technical/Economic Feasibility Study of a 5 MW GTG/ 100,000 pph HRSG Cogeneration System.

Natural Resources Canada, Scarborough, Ontario
Detail Engineering for a 60 kW Microturbine and hot water heat recovery unit.
Case Study